{"id":250,"date":"2019-09-27T00:00:00","date_gmt":"2019-09-27T00:00:00","guid":{"rendered":"https:\/\/sii.ua\/?case-study=rd-support"},"modified":"2019-09-27T00:00:00","modified_gmt":"2019-09-27T00:00:00","slug":"rd-support","status":"publish","type":"case-study","link":"https:\/\/sii.ua\/en\/case-study\/rd-support\/","title":{"rendered":"R&#038;D support"},"content":{"rendered":"<h2>The challenge<\/h2>\n<div class=\"sii-rl-content-item-value sii-rl-businessNeed-value sii-rl-content-item-value-display\">\n<p>Client\u2019s R&amp;D had business need to expand their engineering team. They identified a need of Mechatronic Engineers to join the team, who could work at the confluence of hardware and software.<\/p>\n<\/div>\n<h2>What we did<\/h2>\n<p>We provided a team of qualified engineers with competences in advanced LabView programming, measurement and control circuits design, PCB design and experienced with working under the strict regime of automotive standards.<\/p>\n<p>Our team contributed to Client\u2019s success by improving the standards of\u00a0 mock-up seats building. The team focused on choosing proper hardware (sensors) and creating whole seat control software with in-house built HMI.<\/p>\n<h2>Effects<\/h2>\n<ul>\n<li>Sii\u2019s Mechatronics Specialists allowed the Client to create mock-ups according to the end Customer\u2019s requirements and speeding up the acquisition process<\/li>\n<li>Our Team expanded their know-how in automotive industry<\/li>\n<li>Based on the great feedback, Customer trusted us with further complex requests, e.g. full assembly line design &amp; delivery.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The challenge Client\u2019s R&amp;D had business need to expand their engineering team. They identified a need of Mechatronic Engineers to &hellip; <a class=\"continued-btn\" href=\"https:\/\/sii.ua\/en\/case-study\/rd-support\/\">Continued<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"template":"views\/single-old-case-study.blade.php","offering":[205],"industry":[1108],"client":[109],"technologies":[338,334,337,332,333,336,335],"country":[],"class_list":["post-250","case-study","type-case-study","status-publish","hentry","offering-industrial-engineering","industry-automotive","client-faurecia-en","technologies-control-and-measurement-circuits","technologies-easyeda-2","technologies-hmi-2","technologies-labview-2","technologies-lin-standard-2","technologies-pcb-2","technologies-visual-studio-2"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/case-study\/250"}],"collection":[{"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/types\/case-study"}],"author":[{"embeddable":true,"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"wp:attachment":[{"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/media?parent=250"}],"wp:term":[{"taxonomy":"offering","embeddable":true,"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/offering?post=250"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/industry?post=250"},{"taxonomy":"client","embeddable":true,"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/client?post=250"},{"taxonomy":"technologies","embeddable":true,"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/technologies?post=250"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/sii.ua\/en\/wp-json\/wp\/v2\/country?post=250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}